In addition to the measurements and inspections performed during reconditioning, testing operations are conducted to check the low and high pressure rating, oil pump flowrates at the lowest and highest points, etc. These data are recorded onto the registration card. At this point, the compressor is evacuated for leakage testing with the nitrogen. It is finally painted to its genuine RAL paints and made ready for delivery.